Almost ready for wood!!!


It's all the slow stuff now, work for 2 full days and hardly see a difference
I've got a good 2 weeks worth of trimwork and painting before I can start siding. I spent half the weekend framing up the basement entry (forgot to take a picture of that) and all I have to do is trim it off and roof it.
Then came the trim!!! I started in the front, got the soffits and vents in...and the trim work on the front entry roof. I even had time to put one coat of primer on it

I've got the siding, I may just complete one side for now just get a idea what it's going to look like. 2 coats of trim paint on the gable end and I can start one side.

On a side note with the well, the static level came up pretty high, I can look down it and see water..maybe 15' down? Before fracking, the static level was 360' down. With the 15' static level and the 3/4 gallon per minute recovery, it exceeds the state minimum for that depth of a well (1/2 gpm)