0
So I picked this up from Bergs back in May, by all accounts it's well setup for getting a bike back and fourth from the track as well as moonlighting in some other areas (firewood hauling, squirrel acorn stashing.) Well, I've hauled it to 4 track days at this point and I now have an idea of what I need for gear, tools, consumables, ect. ect. So here's the project break down.
Exterior: fabricate a bracket for the tongue to hold a 20# propane cylinder, my fuel jug, and bolt up a spare tire
Interior: Pit bull TRS for my bike and a Condor/Etrack setup for a second bike. Shelving/work bench area at the front of the trailer where I can roll a tool box in/out of, stash gear, and generally organize "stuff" for easy access. Upgrade interior lighting. New decking and walls that look pretty. Probably do a checkered flag vinyl floor.
Mechanical: rebuild hubs or replace axle. Have to open up the hubs to see if the spindle is damaged but she has a pretty hefty vibration over 55 mph that has been getting worse, due to an incorrect hub rebuild in the past. Give the frame a fresh coat of paint.
Here's where we're starting: