![]() | ![]() |
| Home | Gallery | Classifieds | Arcade | Store | Privacy | Support Us | ![]() |
| |||||||
Welcome to New England Streetriders! You are currently viewing the site as a guest which gives you limited access to most features. | ||||
| | ||||
Most ad placements do not show to registered members. Register Now! |
![]() |
| | LinkBack | Thread Tools |
|
#1
| ||||
| ||||
Summit Point repavedDefinitely worth the drive now: Summit Main repave spy pics....day 1 - DCSportbikes.net: Your DC Sportbike Information Portal Don't know if anyone is familiar with the track or not, but they used to have concrete patches thru a few turns....... not anymore! |
|
#2
| ||||
| ||||
Summit Point repavedsweet - possibly add that to the list |
|
#3
| |||
| |||
Summit Point repavedThe cars will fuck it up before the bikes get a chance to ride on it. |
|
#4
| ||||
| ||||
Summit Point repavedi hear it a fun track ... i'm going to try and make a point to go race there next year |
|
#5
| ||||
| ||||
Summit Point repavedlooks like the slippery black stuff, dontit? |
|
#6
| ||||
| ||||
Summit Point repavedWow, they didn't even ground the old surface flat? It will be bumpy and cracking in short order. Probably be fun next year though. |
|
#7
| ||||
| ||||
Summit Point repaved...wonder if they are going to do anything with Jefferson? |
|
#8
| ||||
| ||||
Summit Point repavedOne of my NY shops told me that all three circuits were getting repaved, including Jefferson. |
|
#9
| ||||
| ||||
Summit Point repaved...cool... For a fat old guy on an air cooled, 2 valve twin, Jefferson is a hoot!!! |
|
#10
| ||||
| ||||
Summit Point repaveddo they have some left handers there that i can pass you on the outside? |
|
#11
| ||||
| ||||
Summit Point repavedslippery point w/o the concrete patches?!?!? it just won't be the same....and T3(?), entrance to the carousel, and the end of the carousel are lefter's |
|
#12
| ||||
| ||||
Summit Point repavedIf your goint to Summit Point don't miss the chili. It's fuckin epic shit!!!!! |
|
#13
| ||||
| ||||
Re: Summit Point repavedYep, cars fucked it up quick. Just got back from 3 days at Summit, one on Main and two on Jefferson. Not as bad as it was but you still have to adjust your line to avoid the worst of it. T1 and the tight left hander into the carosel (sp?), T5 I think, have some good ripples. Still better than a day at work though! |
|
#14
| ||||
| ||||
Re: Summit Point repavedI raced karts down there. It was one of the bumpier tracks, but one of the few driver's tracks on the circuit. I'd love to see it now that its paved. |
![]() |
|
| Thread Tools | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Okay - what's the point?? | Karaya One | Off-Topic Stuff | 12 | 05-08-07 01:07 PM |
| 6hrs of Summit Point | OreoGitorio | Pit Area | 19 | 01-31-07 03:04 PM |
| Route 2, North Adams, repaved | cambelloni | Ride & Event Info. | 4 | 09-08-06 08:28 AM |
| FYI: Rt. 116 in Conway/Ashfield, MA is now repaved. | JeffL | General Bike Related | 18 | 09-15-05 05:49 PM |
| summit 5-1,2 ?? | davegsxrold929r | Pit Area | 5 | 04-15-04 07:46 AM |