0


I have a YSR50 project for $1000.
Boxed in frame.
2005 CRF250 eng.
NSF100 fairings.
![]()
What up, bitches?
trade ya a stock ysr50
other than being assembled. what does it need? more fab work or is it ready to ride once assembled?
Last edited by SVRACER01; 07-27-12 at 07:21 PM.
When I start my KTM in the morning, rules are broken. Its inevitable...
01 SV650S (RC51 eater)/07 690SM /03 300EXC/14 XTZ1200
TRACKS:Firebird/NHMS/VIR/Calabogie/California Speedway/NJMP/MMC/NYST/Palmer/Thompson/Club Motorsports
98% of the fab work is done. It needs forks shock and tires and small stuff but it all adds up. Speedo is a big one.
What up, bitches?