0


CBR300 motor pulled off the donor bike last night. New spark plug installed. just waiting on the swap hardware.
from the videos on YouTube, the block off plate, throttle bodies elbow, and the throttle body mods need to be done before the motor can get bolted to the frame. there is no clearance to do some of these things once the motor is in the frame.
sounds like a nightmare for future maintenance!
this motor i agree as it'll be pretty much all stock. i put a fresh plug in last night when the motor was on the workbench. it will have a cone style intake as there is no room for an air box on the Grom frame.
my red Grom has a high compression motor, so that would want plugs changed more often than the stock 300 swapped Grom.
Nice progress, what your best case first ride / completion date?? Assuming no parts hold up...
All I’m waiting for is the bracket to bolt the motor to the frame. I should have it done this week if that arrives soon.
Today I’ll be prepping the throttle bodies, cleaning the fuel injector, installing the TB elbow, and cleaning up the motor.
Sent from my iPhone using Tapatalk
2023 KTM 890 Adventure R
Manual idle adjuster added. This is required for the swaps as the OEM idle will rev high at stops.
Fuel injector relocated to the 3D printed elbow (installed on motor). The black piece on the throttle bodies is a 3D printed plug for the OEM location for the injector.
Remember to lube the o-ring with motor oil before reinstalling your injector.
Sent from my iPhone using Tapatalk