0
-Christian LRRS/CCS HasBeen ECK Racing
2011 Pit Bike Race CHAMPION!
GMC states the EV Sierra will start at 50k, after this initial top spec model is released.
2012 Tiger 800 XC
The Silverado EV is expected to sticker for $108K for the loaded out version. The work version is supposed to come in mid 50's I think
2003 ZX7R
1995 916
for shits and giggles, I was looking online at Volvo electric excavators, no big ones yet, 5000lb (biggest one) is just over $100k, 24" digging bucket, no thumb, blade without angle (didn't see those build options) 4 hr run time, 5 hr charge time on 220. fast charger cost $8k and requires 3 phase
how much actual run time ? I assume it's only "running" when you are actually spinning the hydraulic pump, unlike a diesel that is still idling
RandyO
IBA#9560
A man with a gun is a citizen
A man without a gun is a subject LETS GO BRANDON
A wild EV truck appears!
Foxconn, Maker of iPhones, Unveils Foxtron Model V Electric Pickup Truck:
https://www.motortrend.com/news/foxc...-pickup-truck/
Last edited by PurplePackage; 10-21-22 at 01:34 PM.
I would 100% buy a 3 ton electric mini ex
RandyO
IBA#9560
A man with a gun is a citizen
A man without a gun is a subject LETS GO BRANDON
something the manufacturers have to figure out, possibly using the boom of the excavator
the other alternative is at the end of the day, leaving a generator running all night to recharge the battery for next day's use, or load it up and haul it back to shop.
manufacturers have to come up with a practical solution to keeping the battery charged while on a construction site
RandyO
IBA#9560
A man with a gun is a citizen
A man without a gun is a subject LETS GO BRANDON
Test rode a bunch of electric mowers today at equip2022. I love the quiet and lack of vibration.
I can’t say if they lacking power because it was a controlled closed course with short lawn. How would they handle regular mowing? I think absolutely fine. Tall wet grass or leaves is what I wanna know.
Also the dewalt one caught on fire at the event (not in my hands lol)
Unless the batt is dead dead. We've replaced tracks on big cats we transported via barge to islands with no power so were there is a will there is away. The need for 3 phase sucks balls as it's been my experience when doing the work I do you're lucky to have a temp set up. When I did solar the battery packs were 6 cells per box so imagine 3 car batteries stacked would be one cell. Not easy and heavy yes but not impossible to replace one at a time even by boat. Also and I'm just guessing the cost to run it back to the shop every night would cut into any financial benefit of an ev HARD.
Last edited by G21forme; 10-22-22 at 12:11 AM.
I've watched a guy lose a track in the woods and put it back on with his bucket, the only practical way imho, is to have field swapable batteries, most contruction sites I visit do not have power yet, and I'm seeing fewer generators, and more often, a pile of charged batteries for cordless tools and maybe a smaller inverter generator to keep the batteries charged
RandyO
IBA#9560
A man with a gun is a citizen
A man without a gun is a subject LETS GO BRANDON
I think you'll see hydrogen before electric in terms of large scale equipment.
https://electrek.co/2022/05/06/the-w...k-starts-work/The 2 megawatt (MW) hydrogen-battery hybrid truck generates more power than its diesel predecessor and is capable of carrying a 290-tonne (320-ton) payload.
The truck includes a 1.2 MWh battery pack, as the haul truck system uses multiple fuel cells, which deliver up to 800kW of power.
It’s designed to operate in everyday mining conditions at its Mogalakwena PGMs mine in northeast South Africa. The mine is the world’s largest open-pit platinum group metals mine. Anglo American intends to replace a fleet of 40 trucks there that use around a million liters of diesel annually.
The truck is part of Anglo American’s nuGen Zero Emission Haulage Solution (ZEHS), a green hydrogen system at the mine site. The system will draw power from a solar farm to supply a hydrogen electrolyzer to split water, which will then provide the trucks with green hydrogen fuel.
The ZEHS project is expected to be fully up and running by 2026. It’s the first step in making eight of the company’s mines carbon neutral by 2030. The global mining company has set a target of getting all of its operations to net zero by 2040.
-Christian LRRS/CCS HasBeen ECK Racing
2011 Pit Bike Race CHAMPION!
So, it's not like swappable batteries are unsolved tech, so... why didn't this unit come out with them out of the crate? Maybe the tradeoff in power density, power capacity and weight?